Edition
Sunday, November 22
Updated
1:06 PM EST

Owner builds

Contractors keep skipping a New Jersey mudroom job. What state rules say a real bid must include

A South Jersey homeowner says contractors keep missing appointments or go quiet after quoting, even on a porch-to-mudroom job of about $30,000 and a $100,000 garage conversion. New Jersey's consumer rules spell out what a serious contractor has to put in writing.

The owner laid out the problem in a post on Reddit's r/Contractor forum. Contractors book a visit and never arrive, or give a number (one priced the garage at $100,000) and then stop answering calls and emails. Some of the figures came without anyone pulling out a tape measure. The owner hired an architect after one company asked for drawings, gives firms about three weeks to reply and drops one after two no-shows.

Home improvement contractors in New Jersey must be registered with the state's Division of Consumer Affairs, and towns will not issue construction permits to firms that haven't, the division's consumer guide says. Any job over $500 needs a written contract showing the contractor's legal name, business address and registration number, when work starts and ends, what will be done, and the total price. The contractor also has to hand over a copy of its commercial general liability policy with the insurer's phone number.

The division tells owners to collect written estimates from at least three contractors and ask how long each has been in business and whether subcontractors will do the work. It flags as warning signs a request for more than a third of the price up front, a demand for cash and a business address that is only a P.O. box. A contractor may not demand the final payment before the work is complete, and the owner can cancel a signed contract until midnight of the third business day after getting a copy.

A garage conversion like this one, with a wall opened up, new wiring, heat, insulation and windows, needs permits. When an electrician or plumber does the work, the permit has to be signed and sealed by a New Jersey licensed electrical contractor or master plumber, and an architect who drew the plans must sign off, the guide says. Final inspections come before the last payment.

Why it matters: Remodelers in New Jersey need a state registration number, liability insurance and a contract with the required terms before a town will issue them a permit. Owners can check a firm's registration and complaint history with the Division of Consumer Affairs before booking a visit.

Sources

More in owner builds