Edition
Sunday, November 22
Updated
1:06 PM EST

Owner builds

Palo Alto's Stanford Terrace Inn site could become 20 factory-built homes on lots 18 feet wide

Palo Alto's Planning and Transportation Commission on Wednesday backed splitting 531 Stanford Ave., where the boarded-up Stanford Terrace Inn stands, into 20 lots with a factory-built home on each, the Palo Alto Daily Post reported. The City Council takes up the subdivision on Dec. 7.

The narrowest lots would measure 18 by 50 feet. Brian O'Neill, the attorney for the property owner, told commissioners the small homes would be affordable by their size alone, according to the Daily Post. Commissioner Bart Hechtman said he had never seen the prototype before. The vote covered only the subdivision, not the homes, and state law leaves the city little room to turn the project down, the paper reported.

The plan has shrunk over the past year. A September 2025 filing called for 22 three-story homes of 2,556 square feet each, every one with a ground-floor garage and one set aside for a very low-income household, SF YIMBY reported. The plan set described them as modular homes approved by California's housing department. The site covers about 0.72 acre between Stanford and Oxford avenues, behind shops on El Camino Real.

The hotel has been empty since the city moved its tenants out. Fire crews on a medical call in September 2023 found corroded sprinklers and broken alarms, and a March 2024 inspection by the fire marshal turned up blocked exits, corroded wiring and a balcony at risk of falling, according to the Daily Post. The city ordered the buildings torn down by Oct. 20. That demolition is on hold while the owner challenges the order in federal court, with her attorney arguing the city retaliated after she would not sell for a homeless shelter.

Neighbors in College Terrace wrote to the planning director that the homes would raise fire danger and block daylight. Commissioner Tom Siegel raised the safety of children biking to school on Stanford Avenue.

Why it matters: Small factory-built homes on lots 18 feet wide will test how far state housing laws carry infill in high-cost cities. Modular suppliers and site contractors should watch the Dec. 7 council vote and what it demands on fire access and spacing.

Sources

More in owner builds