Edition
Thursday, November 26
Updated
9:09 PM EST

Jobsite hacks

Deck ledger mistakes that slip past permit reviews, from SIP rim joists to bay windows

Fine Homebuilding tech editor Mark Petersen lists deck details a plan review or site inspection may not catch: ledgers fastened to SIP rim joists or bay windows, decks built flush with the door sill, skimped fastener schedules and interior-grade hangers.

Petersen, who has built decks that are still standing after more than 30 years, writes in the December/January issue that a deck can pass code and still have weak spots. The first is what sits behind the siding. A production builder he worked for swapped batt-filled rim cavities, which were causing moisture damage, for SIP rim joists with an EPS foam core. Within a year deck builders and owners were lagging ledgers into them, so most of the screws held only the thin facing layers instead of solid lumber.

When resurfacing an old deck, he says, confirm what the ledger is fastened to. If the floor has a SIP rim or trusses with only a ribbon board, ask the component maker for an approved connection, bring in an engineer, or set a beam on posts close to the wall and let the deck stand on its own. The same goes for ledgers on cantilevered bump-outs, bay windows or bare stud walls. The American Wood Council's DCA 6 guide prohibits ledgers on overhangs and bays, and the council says any cantilever where the house rim joist lacks full bearing calls for a freestanding deck or an engineering evaluation.

Petersen also sets decks a few inches below the door sill where he can, after replacing patio doors whose sill or ledger flashing failed and rotted the subfloor. Dropping the ledger can break the required fastener edge distances, so he uses smaller joists with an extra beam to shorten spans, or gets an engineered connection.

On hardware, he checks that hangers are rated for outdoor use with the treated lumber on the job, keeps stainless and galvanized parts apart, uses the nails the connector maker specifies and fills every hole. His only deck callback came from composite fascia he under-screwed; it buckled. Unapproved fasteners or clips can also void a decking warranty.

Why it matters: Resurfacing and add-on jobs often skip a full inspection, so the ledger risk lands on the deck builder. Checking what the ledger is fastened to, and whether a bay or cantilever carries it, is the point to switch to a freestanding frame.

Sources

More in jobsite hacks