Edition
Thursday, October 29
Updated
12:46 PM EDT

Jobsite hacks

Green crust on PEX brass fittings: condensation or dezincification, and when to replace them

White or green crust on a few brass PEX crimp fittings in a house on a well can be surface corrosion or zinc leaching out of the brass. A cut-open fitting and a certified lab water test show which, according to a Tennessee home inspector and Penn State Extension.

The typical case: a well-water house repiped in PEX-B with brass crimp fittings shows a white-green crust on the fittings under one sink two years later, while others nearby look new. The owner suspects sweating cold lines or dezincification. Dezincification pulls zinc out of yellow brass and leaves weak, copper-rich metal behind, Scott Patterson of Trace Inspections near Nashville wrote. Outside, it shows as chalky white crust or blue-green stains. Cut open, the fitting is reddish-tan and porous.

Patterson lists low or high pH, chlorine or chloramine, high oxygen and standing water as triggers. He ties most failures to yellow-brass fittings installed from the mid-1990s to the early 2010s, including Zurn fittings stamped QPEX and NIBCO F1807 fittings, both the subject of lawsuits. Other signs are damp joints and hot and cold sides that flow unevenly. Makers moved to dezincification-resistant (DZR) brass or PPSU plastic fittings after those failures, he wrote.

Water chemistry is the second check. Penn State Extension says about 60% of private wells, springs and cisterns in Pennsylvania have corrosive water, with bluish-green stains, metallic-tasting first water and small leaks as symptoms. It recommends a certified lab test for corrosivity by the Langelier Saturation Index, where a negative value means corrosive water, plus a first-draw sample for copper and lead. The drinking water standards are 1.3 mg/L for copper and 15 parts per billion for lead. Corrosive water is treated where it enters the house, with a neutralizing filter of limestone chips or magnesium oxide, or a soda ash feed pump.

Pull one crusted fitting and one clean one and cut both. Solid yellow brass under the crust means the fitting still has its zinc and the deposit came from outside. Porous pink metal means dezincification, and Patterson treats a few failing fittings as a warning of a larger plumbing failure.

Why it matters: Brass fittings behind drywall make for an expensive callback. On well jobs, test pH and corrosivity before choosing fittings, and use DZR brass or PPSU where the water is aggressive.

Sources

More in jobsite hacks