Edition
Sunday, November 22
Updated
1:06 PM EST

Fails & scandals

Brooklyn building collapse: LMW Engineering's president, who drew the dig plans, twice advised on NYC code rewrites

Jieming Wang, president of New Jersey-based LMW Engineering Group, whose firm drew the excavation and shoring plans for the dig beside the Flatbush building that collapsed on Nov. 11, was appointed twice, in 2017 and 2023, to advisory panels working on New York City's construction codes, NBC New York reported from Department of Buildings records.

The records list Wang among several dozen industry professionals appointed to work on the rules that govern inspections at active construction sites. The Department of Buildings told NBC New York that hundreds of volunteers from the industry discuss code changes, which the City Council later votes on. It did not say how Wang was chosen. He has not been accused of wrongdoing in the collapse, which killed eight people, and he did not return the station's messages.

Before LMW filed plans to dig as deep as 14 feet at 2625 Bedford Avenue, owners of neighboring buildings at other jobs had sued the firm four times, claiming excavation damaged their property, according to court records cited by NBC. A 2009 suit from Sunset Park and a 2018 suit from Prospect Heights were settled without any admission of fault. A third case was dismissed because the owner did not move it forward in time, and in a 2017 Gravesend case a judge dropped LMW while other parties settled. LMW denied responsibility in those cases and at times blamed subcontractors. It was never found liable.

The Department of Buildings said the earthwork and excavation support plans for the three-story project went through a full plan exam and met city requirements. The Real Deal reported that those approved plans called for no steel bracing or underpinning of the neighboring buildings. Since the collapse the department has inspected at least 24 job sites tied to the two engineers on the Flatbush dig and stopped work in full or in part at five or more, within a sweep of about 160 projects linked to six firms.

Mitchell Winn, a lawyer who has sued LMW before, told NBC he could not see how an engineer with that record of neighbor lawsuits ended up helping write the inspection code.

Earlier: Brooklyn building collapse: injured workers sue developer, contractors and engineers over shoring

Why it matters: A city plan approval says the drawings meet code, not that the dig will protect the building next door. Before excavating beside an occupied structure, pull the engineer's court and DOB violation history and get the underpinning or bracing design in writing.

Sources

More in fails & scandals