Boston Fields Corner library: how did the city build its first glulam branch for $30.9 million?
Boston framed its new $30.9 million Fields Corner branch library in Dorchester with exposed glulam beams in place of steel, and used wood for the floor slabs and wall framing too. The two-story, all-electric building opens Dec. 12 as the first Boston Public Library branch built on engineered wood.
The branch covers 14,790 square feet over two floors and replaces a building that opened in 1969 at the corner of Park Street and Dorchester Avenue, the Dorchester Reporter reported in a story carried by WBUR. A ribbon cutting is set for 10 a.m. on Saturday, Dec. 12.
Glulam, or glue-laminated timber, carries the superstructure, and the beams are left exposed inside. Wood goes beyond the main frame here and into the floor slabs and the wall framing, Evan Brinkman of the city's Public Facilities Department, where he heads design work as assistant director, told the Reporter. No earlier BPL branch has used the method, according to the report.
The building burns no fossil fuel. It was designed to the city's Zero Net Carbon standard for municipal buildings, is aiming for LEED Gold certification, and has a roof built to take solar panels later. Residents shaped the design over six public meetings, one of them given over to sustainability.
Inside are about 33,000 volumes, a 100-seat community room that can be rearranged, a classroom for 20, two study rooms, spaces for children, teens and adults, and an outdoor reading terrace on the second floor. The report did not name the general contractor or say whether the job came in on its budget.
Why it matters: A city-owned public building with an exposed glulam frame, wood floor slabs and wood wall framing is now finished in Boston at a stated $30.9 million budget. Architects, timber erectors and GCs pricing Northeast civic work have a local mass timber job to tour and compare against.