Temple Sinai roof collapses in Hollywood, Florida, after 9 inches of rain overnight
Part of the roof of Temple Sinai of Hollywood, at 1400 N. 46th Ave. in Hollywood, Florida, gave way early Nov. 18 after about nine inches of rain fell on the city overnight, according to Hollywood officials. No injuries were reported.
The call about the synagogue came in just before 7 a.m., the city said in a release issued together with its police and fire-rescue departments, as reported by Boca Post. Building officials and the fire marshal went to the scene. WSVN described the damage as a partial roof collapse, and Hollywood Fire-Rescue said nobody was hurt, CBS News Miami reported.
The city said nine inches fell between 11 p.m. Tuesday and 4 a.m. Wednesday. WSVN put totals above 12 inches in parts of Hollywood and Davie. The storms brought more than 300 calls for service in Hollywood, closed Broward County schools for the day and shut lanes of Florida's Turnpike and I-95. A flood watch for South Florida runs through Thursday.
Officials had not said which section of the roof failed or why, beyond pointing to the rain, and the building's roof type and age were not reported.
Water that cannot leave a low-slope roof fast enough adds weight, and the deck sags and holds more. The International Building Code requires secondary, or emergency overflow, drains or scuppers wherever a parapet or other perimeter construction would trap water if the main drains back up, and it sizes scuppers so ponding stays within the depth the roof was designed to carry, according to a code review by the building enclosure group IIBEC. Since the 2015 edition, reroofing jobs on roofs with positive drainage have not had to add overflow drains, the group noted, though existing ones may not be removed.
Why it matters: Nine inches in five hours tests every flat roof in Broward. Roofers and owners of low-slope buildings should confirm overflow drains or scuppers exist, are clear and sit at the right height before more rain arrives this week.
Sources
- Overnight storms cause extensive flooding in Broward, Miami-Dade; part of synagogue's roof collapses in Hollywood due to rainWSVN 7News, Nov 18
- Roof collapses at Hollywood synagogue due to heavy rain; flooding forces officials to close Broward schools WednesdayCBS News Miami, Nov 18
- Hollywood Floods After 9 Inches Of Rain; Turnpike, I-95 Closed, Temple Roof Collapse ReportedBoca Post, Nov 18
- Roof collapses at Temple Sinai in Hollywood after heavy rainWPBF, Nov 18