Sri Lanka awards 11 contracts worth Rs 251 billion for the Ruwanpura Expressway's first phase
Sri Lanka's Cabinet has approved 11 construction contracts worth about Rs 251.37 billion, VAT included, for the first phase of the Ruwanpura Expressway, a 22.18-kilometer stretch from Kahathuduwa to Ingiriya.
The section runs from kilometer 1+820 at Kahathuduwa to kilometer 24+000 at Ingiriya and includes a system interchange, the Daily Mirror reported. The Cabinet first cleared this phase on July 27, 2026. Bids for the 11 packages were then called under the national competitive procurement system, and the awards follow the recommendations of the High Level Procurement Committee, according to the paper and Hiru News. The proposal went to the Cabinet from the Minister of Transport, Highways and Urban Development.
The biggest package, Rs 34.94 billion, went to International Construction Consortium (Pvt) Ltd, Hiru News reported. K.D.A. Weerasinghe & Co. (Pvt) Ltd won Rs 33.11 billion. Access Engineering PLC took two packages, at Rs 27.99 billion and Rs 17.62 billion, and Maga Engineering (Pvt) Ltd also took two, at Rs 23.01 billion and Rs 16.98 billion. NEM Construction (Pvt) Ltd won Rs 24.30 billion and the Senura and Sanken joint venture Rs 20.83 billion. The last three, at Rs 18.48 billion, Rs 17.96 billion and Rs 16.15 billion, went to Tudawe Brothers (Pvt) Ltd, RR Construction (Pvt) Ltd and Edward and Christie (Pvt) Ltd in that order.
That puts every package between about Rs 16 billion and Rs 35 billion. Neither report gave a start date, a construction period or the source of funding.
Why it matters: Splitting 22 kilometers of expressway into 11 packages, tendered through national competitive bidding, spreads the work across many mid-sized builders. The owner then has to manage the interfaces and schedule ties between 11 contractors on one road.
Sources
- Cabinet clears 11 contracts for Kahathuduwa-Ingiriya expressway sectionDaily Mirror, Nov 17
- Cabinet approves Rs. 251.37 billion in contracts for first phase of Ruwanpura ExpresswayHiru News, Nov 17