Édition
mardi 27 octobre
Articles
22
Mis à jour
21:08 (New York)

Labo

Impression 3D, bois massif, robots, nouveaux matériaux et autres expériences.

LaboEn anglais

UMaine's $82 million factory will try to print homes at production scale

The 50,000-square-foot mass timber building in Orono houses a large polymer 3D printer and will develop bio-based building materials, ENR reports. A pilot with the nonprofit Penquis plans to print up to nine 600-square-foot homes around Bangor over three years. Consigli is construction manager.

Why it matters: Most printed homes so far are one-off demos. The Penquis homes could produce real cost, schedule and code data for repeatable production.

LaboEn anglais

How a modular NFL facility went up in under three months

WillScot's head of fleet operations walked Construction Dive through a modular build for the Los Angeles Rams: what went into the building, how the schedule was compressed and how the jobsite was coordinated.

Why it matters: A practical case study if you are pitching modular to an owner with an immovable date.